Finished Basement to Accessory Dwelling Unit : How Long Will the Conversion Take ?

The duration for converting your lower level into an ADU can differ considerably, usually ranging from approximately 8 to 20 periods, but potentially extending longer depending on various factors. These include the existing condition of the space , the scope of the work (e.g., adding a bathroom , kitchen ), necessary permitting clearances, and the

read more